Basically, we just installed the Pitman arm, moved the box forward and backward until the drag link was parallel with the tie rod, then moved it up until the top of the upper tab was about flush with the top of the rail.
Basically, we just installed the Pitman arm, moved the box forward and backward until the drag link was parallel with the tie rod, then moved it up until the top of the upper tab was about flush with the top of the rail.