Construction on the nearly 2,000 foot long bridge (with a 1,060 foot twin-rib concrete arch) began in late January 2005 and traffic began using the Hoover Dam Bypass on October 19, 2010. This signature bridge spans the Black Canyon (about 1,500 feet south of the Hoover Dam), connecting the Arizona and Nevada Approach highways nearly 900-feet above the Colorado River.
Construction on the nearly 2,000 foot long bridge (with a 1,060 foot twin-rib concrete arch) began in late January 2005 and traffic began using the Hoover Dam Bypass on October 19, 2010. This signature bridge spans the Black Canyon (about 1,500 feet south of the Hoover Dam), connecting the Arizona and Nevada Approach highways nearly 900-feet above the Colorado River.

Construction on the nearly 2,000 foot long bridge (with a 1,060 foot twin-rib concrete arch) began in late January 2005 and traffic began using the Hoover Dam Bypass on October 19, 2010. This signature bridge spans the Black Canyon (about 1,500 feet south of the Hoover Dam), connecting the Arizona and Nevada Approach highways nearly 900-feet above the Colorado River.

Technical Details

  • Camera: iPhone 4
  • Taken: June 19, 2011
  • Focal length: 3mm
  • Aperture: f/2
  • Exposure: 1/1,371 second
  • ISO: 80

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.